Pool Remodeling and Renovation in Flower Mound, TX
Flower Mound Pool Resurfacing handles pool remodeling and renovation in Flower Mound, Texas: a new interior finish with new waterline tile and coping, often with changes to the pool itself, such as an added spa, a tanning ledge and steps, water features or a shallower deep end. The Town's subdivision records date 43.9% of its residential lots to the 1990s, and a Dallas–Fort Worth tile and coping guide from 2026 says tile and coping take the same 15 to 20 years of sun, water and chemicals before they wear out.
Request a free estimate, any time. We'll talk through what to change, which Town permits and HOA approvals the work needs, and what can be done in a single drain-down.
Call or request a free estimate any time, 24/7
No charge · answered 24/7
Get free estimates

What a pool remodel can include
New finish, tile and coping together
Pebble Technology International lists the problems that usually start a remodel: leaks, cracks, mottling, mildew or algae, hollow pool walls, and loose pebbles or tiles. In a remodel, it says, the finish and the waterline tile are usually completed at the same time. A pebble pool finish is the most durable surface the National Plasterers Council knows, and pool coping repair and replacement renews the edge that keeps water from getting behind the shell.
Adding a spa
The International Swimming Pool and Spa Code governs residential spas through its spa chapter: water no deeper than 4 feet from the design waterline, seats no deeper than 28 inches, a floor slope no steeper than 1 in 12, and incoming makeup water no hotter than 104°F. Hot tubs and spas need a Town permit, and for structural questions the American Shotcrete Association suggests a local engineer familiar with pools and spas. More on adding a spa to an existing pool.
Tanning ledges, steps and benches
For a backyard pool, the 2021 International Swimming Pool and Spa Code gives each stair tread a 10-inch minimum depth and at least 240 square inches of walking surface, keeps risers other than the top and bottom ones to 12 inches or less, and puts underwater seats, benches and swimouts no more than 20 inches below the design waterline. The Town's own stair and swimout-stripe amendments cover public pools, such as apartment and HOA pools, not backyard ones. Ledge depths and bubblers are covered under tanning ledge and pool step additions.
Waterfalls, scuppers and bubblers
Pentair says waterfalls usually sit in the bond beam just above the tile line or in a raised wall above it, and that the wall thickness, the tile or stone thickness and the weight of the covering all need planning. Custom Molded Products' scupper instructions set each scupper 1/8 inch off level, tipped toward the pool, so the water clears the lip. Flow rates and filters are on the page about pool water features and waterfalls.
Making a diving pool shallower
Converting a diving pool makes it what the code calls a Type O nondiving pool, which may not carry diving equipment. The 2021 model code sets a residential shallow end at 33 inches to 4 feet deep, and where the deep area stays over 5 feet, it needs its own way in and out. See diving pool conversion.
Flower Mound Pool Resurfacing can price a remodel with any mix of these in one free estimate.
Call or request a free estimate any time, 24/7.
(469) 526-3886
How a pool remodel runs, from permit to start-up
Permits and HOA approval first
Under the Town's amended pool code, whoever intends to construct, enlarge, alter or repair a pool or spa must apply for and obtain the permits first, and must register as a contractor with the Town. A pool permit covers only pool or spa construction; a job with several outdoor projects is filed as an Umbrella permit. Plan review for pools usually takes 5 to 7 working days, and pool electrical and plumbing work must be done by a licensed electrician and a licensed plumber authorized to work in the town. The guide to pool remodel permits and HOA approval walks through both.
New concrete against the old shell
Where a remodel adds a spa, a ledge or new steps, new shotcrete meets the old shell. The American Shotcrete Association says the joint acts as one piece if the old surface is roughened and clean and brought to a saturated surface-dry condition, that no bonding agent should be used, and that new shotcrete needs at least 7 days of curing. The Town's pool packet makes no concrete inspection unless it is at least 38 degrees and rising, and none when the Assistant Building Official finds it too wet.
Fencing while the pool is open
The model code calls for construction fencing at least 4 feet high around an in-ground pool site from the start of excavation until the permanent barrier is finished, and whether a given remodel counts is the code official's call. Flower Mound's own barrier rules ask for at least 48 inches, measured on the side away from the pool, and self-closing, self-latching gates that swing away from it.
Finish, fill and start-up
The new finish is placed in a single application, the fill then runs without stopping, and the National Plasterers Council says a new finish is especially open to staining and scaling in its first 28 days. For the season and the summer heat, see when to resurface a pool in North Texas.
Flower Mound Pool Resurfacing will lay out the permits, inspections and order of work before the pool is drained.
Call or request a free estimate any time, 24/7.
(469) 526-3886
Flower Mound conditions that shape a remodel
Pools built with the 1980s and 1990s homes
Of Flower Mound's 28,789 housing units, 11,597 were built in the 1990s and 4,381 in the 1980s, according to the Census Bureau's 2020–2024 American Community Survey. The Town's subdivision records date Timber Creek, the former Flower Mound New Town, from 1973 to 1994, Glenwick Estates to 1990, the Villages of Northshore and the older Northshore PUD from 1979 to 1998, the Estates at Tour 18's first sections to 1994 and Stone Hill Farms from 1997 to 2000. SGM, a finish maker, says most traditional plaster shows significant wear by the 5 to 7 year mark.
HOA review for additions
Wellington's Architectural Control Committee must approve adding a pool, an outdoor kitchen, a firepit, a patio cover or an arbor, and Town approval doesn't count as its approval; the committee has up to 30 days to review, usually about 5 to 10. The Town enforces only its own ordinances, not HOA rules or deed restrictions.
Setbacks, easements and soil
Flower Mound keeps pools, spas and their decks out of front yards and easements and at least five feet from side and rear property lines, and a pool closer to a building's foundation than 3 feet, or than its own depth, needs a sealed engineered design. USDA soil ratings put about a third of the town's land on soils Very limited for homes because they shrink and swell.
We take on remodels across the towns we serve, and our page on pool remodeling in Coppell covers that town. Ask Flower Mound Pool Resurfacing what your HOA and the Town will want to see.
Call or request a free estimate any time, 24/7.
(469) 526-3886
What a pool remodel costs around Dallas–Fort Worth
- Light remodel: tile and coping (DFW, 2026)
- $5,000–$12,000
- Mid remodel: tile, coping and surface (DFW, 2026)
- $10,000–$25,000
- Full remodel: plus stonework, fire features or a kitchen (DFW, 2026)
- $25,000–$80,000+
- Adding an in-ground spa to an existing pool (DFW, 2025)
- $18,000–$35,000
- Tanning ledge or Baja shelf on an existing pool (DFW, 2026)
- $2,000–$10,000
- Basic waterfall or scupper on an existing pool (DFW, 2026)
- $1,000–$5,000
- Deep-to-shallow conversion (Dallas, 2026)
- $4,000–$7,000
Published averages and other companies’ ranges, not our prices. A real price needs a site visit.
Remodel figures for Dallas–Fort Worth in 2026 leave out draining and refilling, hauling off old material and any city permit, and add $1,000 to $5,000 or more in prep where the concrete under the tile is cracked, the deck is failing or old work has to come out first. The Town's fee schedule from October 1, 2026 lists $430 for an in-ground pool permit and $250 for a spa, with a $120 plan review credited toward the permit; it names no fee for a pool remodel. Finish-only totals are in the guide to pool resurfacing cost in Flower Mound, and a free estimate from Flower Mound Pool Resurfacing covers the whole job.
Call or request a free estimate any time, 24/7.
(469) 526-3886Pool remodeling questions and answers
How much would it cost to remodel a pool?
In Dallas, published 2026 figures average $9,829 for a pool remodel, with most between $5,209 and $14,520, depending on scope. National averages from 2025 are close: $10,484, with most projects $5,597 to $15,771, and changing a pool's size or shape starts at $15,000 or more. Flower Mound Pool Resurfacing prices a remodel after seeing the pool and hearing what you want changed.
Is it cheaper to remodel a pool or build a new one?
Typically, yes. Dallas–Fort Worth figures for 2026 put a new pool at $60,000 to $150,000 or more for a typical home, and even a full premium remodel at $40,000 to $80,000 on a structurally sound shell. The 2021 International Swimming Pool and Spa Code also lets a lawfully built pool keep being used and maintained, as long as repairs follow its original design and create no hazard.
Can an existing pool be modified?
Yes, within the code. Its 2021 and 2027 editions have additions and alterations meet the rules for a new system without forcing the rest of the pool up to the current code, and the American Shotcrete Association says properly placed shotcrete bonds monolithically to well-prepared old concrete. Reshaping is the big ticket: Dallas figures for 2026 put reshaping a concrete pool at $60,000. Ask Flower Mound Pool Resurfacing what your shell can take.
How to modernize an old pool?
Start with the surface and the edges: a pebble, quartz or polished finish with new waterline tile and coping, usually done together in one drain-down. Then the features: a tanning ledge with bubblers, which Pentair sets in water 2 to 12 inches deep; a sheer descent, which it keeps to 3 feet or less; or a spa. Flower Mound Pool Resurfacing will talk through which upgrades suit your pool and budget.
How to choose the right pool contractor?
Start with what the Town requires: anyone who applies for a permit for pool work must register as a contractor with the Town, and pool electrical and plumbing work must be done by a licensed electrician and plumber authorized in town. Ask whether the installer is approved by the finish maker, since Pebble Technology International sells its finishes only through trained builders and installers and NPT's lifetime warranty needs an approved applicator, and ask how the 28-day start-up will be handled.
Get a free pool remodeling estimate
Flower Mound Pool Resurfacing answers calls and estimate requests 24/7. Tell us about the pool and what you would like to change or add.




